The Opus Group
Transmission line engineering · 115–500 kV

From route selection to optimized line design.

Overhead transmission line engineering, 115 kV to 500 kV: route selection, structure and conductor design, clearances, and drilled shaft foundations — modeled in PLS-CADD, PLS-POLE, and TOWER (Power Line Systems), delivered as plan-and-profile an EPC can build.

DISCIPLINETransmission
VOLTAGE115–500 kV
TOOLSPLS-CADD · PLS-POLE · TOWER
SCOPERoute → foundation

Line design, end to end

01 / SCOPE
TX-01 · ROUTE

Route selection

Corridor and route studies — structures sited to terrain, constraints, and clearances.

TX-02 · STRUCTURES

Structure design

Pole and lattice tower structures analyzed in PLS-POLE and TOWER (Power Line Systems) — load cases, capacities, and framing.

TX-03 · CONDUCTOR

Conductor & sag-tension

Where you set the conductor, I design to it; given an ampacity, I propose type and size — with sag-tension charts and manufacturer load tables.

TX-04 · CLEARANCES

Clearances

Ground, crossing, and code clearances verified through the modeled line — to NESC as the general design basis, and to CPUC GO 95 where the line is CPUC-jurisdictional in California.

TX-05 · FOUNDATIONS

Drilled shaft design

Drilled shaft foundations designed to the structure reactions (FAD Tools).

TX-06 · SET

Plan & profile

The PLS-CADD model and plan-and-profile drawings (AutoCAD). Terrain models are built from LiDAR-derived survey where coverage exists, and the vertical datum of every model is declared explicitly.

Modeled in the tools utilities and EPCs trust

02 / TOOLCHAIN
PLS-CADD

Line modeling, clearances, plan-and-profile.

PLS-POLE

Pole structure analysis — wood, steel and concrete, tangent through dead-end.

TOWER (Power Line Systems)

Latticed steel tower analysis, finite element.

FAD Tools

Drilled shaft foundation design.

AutoCAD

Construction drawings.

Every clearance, load case, and foundation reaction traces to the model and a datasheet. Open the model and check it yourself. Line design — structures, conductor, clearances, foundations. System and protection studies sit with their specialists.

Three steps

03 / PROCESS
01ROUTE

Route & constraints

Corridor selection and structure siting to terrain and clearances.

02MODEL

The line is modeled

Structures, conductor, and clearances in PLS-CADD + PLS-POLE + TOWER; foundations to the reactions.

03DELIVER

The set

Plan-and-profile, structure and foundation design, sag-tension and load tables.

Have a line to engineer?

Let's talk about your line.

Utilities, developers, and EPCs: transmission line design from 115 kV to 500 kV, modeled in PLS-CADD, PLS-POLE, and TOWER.